jdupre
03-25-2003, 12:12 PM
Is there a way to control when blazerouter drops a via to a plane versus running a trace to the nearest pad of the same net?
When I use blazerouter it appears to prefer running rather long power and ground connections rather than just dropping a via. These needlessly long traces often screw up other routes and take up valuable surface area. So I find myself having to manually route power and ground connections on dense boards.
It seems to me that there should be some sort of length control that specifies how long a trace can be before blaze just drops a via to the respective plane.
- Joe
When I use blazerouter it appears to prefer running rather long power and ground connections rather than just dropping a via. These needlessly long traces often screw up other routes and take up valuable surface area. So I find myself having to manually route power and ground connections on dense boards.
It seems to me that there should be some sort of length control that specifies how long a trace can be before blaze just drops a via to the respective plane.
- Joe